This is a partial bathroom remodel. Homeowners needed to make their bathroom ADA accessible. The goal was to remove the existing jacuzzi tub and a 3′ x 3′ shower insert. We designed a beautiful walk-in shower, cutting the floor open and locating tile to compliment the existing tile in the home. we were able to match the height of the existing floor to create a seamless transition from existing to new.
Project Year: 2017
Project Cost: USD 10,001 – USD 25,000
Country: United States

Leave a Reply

Your email address will not be published. Required fields are marked *